Immediately After Installation

Immediately After Installation

Keep traffic to a minimum during the first 24 hours to allow the adhesive to harden. Then open to light foot traffic only for the next 24 hours. Resume normal traffic after 48 hours.

Protect and do not disturb the sealed seams on your resilient sheet flooring for at least 16 hours after seam sealer application to ensure a proper seam bond.

Furniture should not be placed on the floor for 24 hours so the adhesive (and grout, if applicable), have had adequate time to dry.

Always move heavy furniture and appliances with care to avoid gouging or tearing the floor. First, lay strips of plywood or hardboard panels on the floor. Then roll, "walk" or slide these items on the strips. Do not push or pull appliances and heavy furniture without taking these precautions.

Wash your floor using Congoleum Bright `N Easy No-Rinse Cleaner or other suitable resilient floor cleaner 48 hours after installation.

Immediately after the installation of a Connections floor:

  • Keep the room temperature between 65F and 85F for at least 48 hours after installation. Maintain the room temperature 55F and 85F thereafter.
  • Do not wash or scrub Connections flooring for at least 5 days after installation. This allows the adhesive bond to develop by preventing moisture and cleaning agents from interfering with the bonding process. Spot cleaning is acceptable, but do not apply excess moisture of cleaning solution.

Caution: Resilient flooring, like other types of smooth floors, can become slippery when wet. Allow time for the floor to dry after washing. Immediately wipe up wet areas from spills or wet feet. Place mats at outside entrances to prevent water, snow or ice from being tracked onto your floor. Improper polishes or finishes can also cause slipperiness.